Saturday, January 5, 2013

Pump Track - November 23, 2012

This is my attempt to start the correction of the bowl.  It has never worked correctly and needs some work.  I pulled in the top edge of the bowl about 2 feet and it appears to have helped but I need another roller or two after it to gain speed into Berm #2.

Top edge of bowl pulled in 2 feet.


With this new bowl edge, you can see on the right of the picture a kicker that was built long ago to flow into the bowl.





No comments:

Post a Comment